Specifically, the changes add notes (and footnotes) to modify the Modes 5 and 6 operability requirements for the IRWST injection and recirculation flow paths, the IRWST and ADS Stage 4 actuation instrumentation and controls, and the CVS automatic isolation function so that they would not be required to be operable in Modes 5 and 6 prior to initial criticality of the core. ML23031A359), titled, “Exigent License Amendment Request: Technical Specification Exceptions for In-containment Refueling Water Storage Tank Operability Prior to Initial Criticality,” designated as license amendment request (LAR) 23-004. With the requested amendment, SNC sought proposed changes to COL, Appendix A, TSs in an application dated Janu(ADAMS Accession No. Nuclear Regulatory Commission, Washington, DC 20555-0001 telephone: 30 End Further Info End Preamble Start Supplemental Information SUPPLEMENTARY INFORMATION: I. William (Billy) Gleaves, Vogtle Project Office, U.S. Start Further Info FOR FURTHER INFORMATION CONTACT: eastern time (ET), Monday through Friday, except Federal holidays. To make anĪppointment to visit the PDR, please send an email call 1-80 or 30, between 8 a.m. You may examine and purchase copies of public documents, by appointment, at the NRC's PDR, Room P1 B35, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. To begin the search, select “Begin Web-based ADAMS Search.” For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-80, 30, or by email ADAMS accession number for each document referenced (if it is available in ADAMS) is provided the first time that it is mentioned in this document. You may obtain publicly available documents online in the ADAMS Public Documents collection at NRC's Agencywide Documents Access and Management System (ADAMS): You may obtain publicly available information related to this action by any of the following methods: Please refer to Docket ID NRC-2008-0252 when contacting the NRC about the availability of information for this action. A request for a hearing or petition for leave to intervene must be filed by May 1, 2023. The amendment was issued on February 8, 2023. Southern Nuclear Operating Company, Inc., (SNC) is licensed to operate VEGP, Unit 3, located in Burke County, Georgia. These changes allow disabling the IRWST injection and recirculation function during the repair activities on VEGP Unit 3 IRWST injection isolation valve 3-PXS-V123A. The amendment involved changes to remove operability requirements prior to initial criticality for (1) the In-containment Refueling Water Storage Tank (IRWST) in Mode 5 (TS 3.5.7) and Mode 6 (TS 3.5.8), and (2) various Protection and Safety Monitoring System and Diverse Actuation System (DAS) automatic and/or manual actuation signals that initiate IRWST, Automatic Depressurization System (ADS) stage 4, and Chemical and Volume Control System (CVS) letdown isolation valves in Modes 5 and 6. The COL amendment involved changes to Vogtle Electric Generating Plant (VEGP), Unit 3, COL Appendix A, Technical Specifications (TS). Nuclear Regulatory Commission (NRC) has issued License Amendment No. Provide legal notice to the public or judicial notice to the courts.Ĭombined license amendment issuance and opportunity to request a hearing and petition for leave to intervene. Rendition of the daily Federal Register on does not Until the ACFR grants it official status, the XML Legal research should verify their results against an official edition of The official SGML-based PDF version on, those relying on it for The material on is accurately displayed, consistent with ![]() While every effort has been made to ensure that Regulatory information on with the objective ofĮstablishing the XML-based Federal Register as an ACFR-sanctioned The OFR/GPO partnership is committed to presenting accurate and reliable Register (ACFR) issues a regulation granting it official legal status.įor complete information about, and access to, our official publications Informational resource until the Administrative Committee of the Federal This prototype edition of theĭaily Federal Register on will remain an unofficial Each document posted on the site includes a link to theĬorresponding official PDF file on. The documents posted on this site are XML renditions of published Federal Register, and does not replace the official print version or the official It is not an official legal edition of the Federal This site displays a prototype of a “Web 2.0” version of the dailyįederal Register.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |